• Characteristics
  • Services and facilities
  • Utilities
  • Positioning
  • Maps
  • Swiss "Industrial Park Giarmata"

    Developed on a 103 ha area in an extremely favourable position close to the main highway connecting Romania to the highway system of Hungary, thus opening our country the way to the other countries in the European Union. The strategic distribution of the project allows the development of a wide range of activities from the operational and logistic ones, to storage or non-polluting manufacturing activities.


    Characteristics

    Industrial area: Parcels: 42 parcels with sizes ranging between 4500 and 9 ha. They can be united or separated, on request.
    Operational situation: 100%
    Occupation degree: available

    Services and facilities

  • Sale and lease of industrial parcels, fitted with all the utilities.
  • Sale and lease of turnkey industrial projects for the buildings and sheds in our industrial park.
  • Support with obtaining the approvals and building permits
  • Access from county road 642
    Timișoara - Lipova
  • Concreted roads bordered by kerbs
  • Sidewalks
  • Alignment green areas
  • DTechnical-urban utilities (water supply, sewerage system and rainwater draining system)
  • Electricity
  • Gas
  • Security
  • Easy access to the CATv, Internet, fixed telephony systems.
  • Parking
  • Utilities

    Natural gas
    • the network may be extended by 4 km.
    Electricity
    • to be provide via the connection to the Enel Distribuţie Banat power network.
    • a transforming station is provided, which is mounted in a tyre with an apparent power of S=1000KVA.
    • All the parcels are cabled via the underground network.
    • The outer lighting system is provided with street lighting posts, fitted with LED sources with a power of 1x70 W and will be carried out automatically by a programmer.
    Drinking water
      The following fittings will be provided to ensure the necessary quantity of water:
    • 1 depth drill
    • 1 water tank
    • 1 pumping station
    • distribution networks on every street
    Fire-fighting water reserve
    • - a 15 l/s fire-fighting flow will be provided via the water supply network to ensure the quantity of water required and to restore the flow of the fire-fighting water reserve.
    • pumping station
    Household sewage
    • a street sewage system made of PVC will be provided
    • will be located in the green area opposite de water supply network
    • a temporary solution is provided to collect the water in a tank, until a purging station is mounted.
    Rainwater drainage system
    • will take over the rainwater from the road, the sidewalks and the green areas, via drainage holes
    • will be carried out through the street network
    • a- the waters will cross an SH hydrocarbon separator and will be discharged in the storage tank with V = approx. 2000 cubic metres, then used to irrigate the green areas
    Road access
    • It is available via the crossroads at km 15 + 220 on county road 691.
    Road network
    • will include transverse profiles of 30 m, 22 m, 20 m, 16 m and 14 m. The streets will have a ballast and broken stone foundation and will be covered in bitumen, and the ones serving the industrial area shall be covered in road concrete.

    Position as to the communication networks



    Traian Vuia International Airport

    16 km



    A1 Highway
     

    1 km



    Main Railroad
     

    5 km

    Maps

    Back to top