    Artemis Group Romania owns in Sananadrei an Industrial Park certified according to the law 186/2013, consisting of 10,5 Ha, at 7 km far away from Timisoara. The plot has an opening of 260 m to National Way Timisoara - Arad, certified from the Urban Zonal Plan approved by the City Hall, having the infrastructure executed. There are available places to be leased in the existing buildings or we can offer you constructions "Build to suit" (on request).


    Characteristics:

    Surface: 10.5 ha
    Parcels: In April 2017 we have a delivery of 4.000 sqm. We are building industrial spaces on our tenants' request. ARTEMIS REAL ESTATE is offering turn key solutions. Artemis Industrial Park is technical well equipped from the infrastructure point of view, offering to the tenants good position, confort and contributing to the tenants' business success.
    Operational phase: 100%
    Occupancy: available

    Services and Amenities

  • Assistance in obtaining building permits and licenses
  • Access from the national road 69
    Timișoara - Arad
  • Concrete and paved roads
  • Side-walks
  • Security
  • Parking
  • Alignment green plots
  • Technical and urban endowments (water sewerage, household sewerage and rain gutter)
  • 2 MVA power supply
  • Gas line
  • Easy access to CATV systems, Internet, fixed telephony
  • Utilities

    Natural Gas
    • existing gas station on site
    Electricity
    • 2 MW existing on site hrough the network connection to ENEL Distribuție Banat Les 20 kV
    • transformer substation is provided, assembled in a dual-chamber tire
    • throughout the underground power-line, the wiring of all the parcels is assured
    • outdoor lighting is provided with street lighting units equipped with 250 W sodium-vapour lights which are placed on galvanized steel metal poles, and it shall automatically start by means of a programmer.
    Potable Water
      In order to provide the necessary of potable water, an Qs flow rate of 2,761 l/s is ensured and the following are performed:
    • 1 deep-water drilling with the ext. D diameter of 250 mm and the H of 122 m
    • 1 water-tank of 263 CBM
    • 1 pumping station
    • EDPE PE 100 polyethylene distribution networks with ext. D of 160 mm with total length of 849 ml
    Water in case of fire
    • to ensure the water requirements and the necessary restoration flow of the fire tank, an outdoor fire-flow of Qie =15 l/s shall be provided, assured throughout the urban distribution network and water management
    • fire hydrants are provided at a distance of maximum 150 m, placed on the water network from the green-ways
    • pumping station
    The domestic sewerage system
    • an urban sewer network is made out of PVC ext. D of 125 mm with couplings and a total length of 495 ml
    • is placed in the green-way, opposite from the water network
    • as an interim solution and for phase I of development, a drainable tank is performed to retrieve household waste-water, following that in the future to be connected to the centralized sewage system that is under construction
    Rainwater sewer system
    • it shall gather the waters off the carriageway, road entrances, parking lots, sidewalks and green areas (23.005 square meters) through drainage
    • PVC pipe network is made with a length of 521 m
    • waters shall run through a SH hydrocarbon separator, then relieved into the SPpl rainwater pumping station, where it will be pumped to the retention tank, then gravitationally discharged into the drainage channel HCn 551, which flows into the Bega Veche river
    Road access
    • facile authorised road access by CNANDR
    Urban road network
    • the 12 m street network includes 7 m of carriageway, framed by green areas (6,5 m) and landscaped sidewalks (2 m)
    • collector road with a length of 256,09 ml
    • access to parcels and parking lots is ensured
    • PVC tubes are provided for laying fibre optic cables
    • along the entire length of the routes, electric manholes to which all the objectives will connect and protection tubes at culverts are provided

    Position towards the means of communication



    Traian Vuia International Airport

    12km



    A1 Highway
     

    1km*


    *up to the second unloading / loading interchange of the highway road traffic.